Medaan Engineering Services LimitedMESLMEDAAN ENGINEERING SERVICES LIMITEDEngineering Today for a Sustainable Tomorrow
+234 806 702 6831info@medaanengineeringservices.comPlot 6, GOP Mall, Nyanya - Jikwoyi Road, Karu Layout, Abuja, Nigeria
Completed

60 kW Solar Backup System

A commercial building backup project documented with a 60 kW system and 60 kWh lithium storage.

Location: African First Ladies Building, Airport Road, Abuja
MESL project photograph: 60 kW Solar Backup System

Project overview

Project overview

The source describes installation of a 60 kW system for the African First Ladies Building on Airport Road, Abuja, including 60 kWh of lithium batteries and a backup-system battery pack.

MESL scope

The supplied images show the equipment installation and MESL personnel working at the electrical distribution and battery equipment. The case is presented as a building-scale solar backup deployment.

Documented outcome and limits

The source records the stated 60 kW system and 60 kWh storage. It does not specify PV module count, inverter topology, energy yield, runtime or savings.

Documented system and scope

  • 60 kW system (as recorded)
  • 60 kWh lithium battery storage
  • Building backup-system installation

Do you have a similar project in mind?

Let Medaan Engineering Services Limited help you explore reliable engineering and solar energy solutions.

Contact MESL
© 2026 Medaan Engineering Services Limited. All Rights Reserved. | Website designed by Tajudeen Oluwadare Ismail, 2026Privacy Policy  |  Terms & Conditions