Project overview
The PDF records a 6.5 kVA system at RCCG Province 3 Pastor Estate in Jikwoyi. The documented configuration combines eight 620 W solar modules, two tall tubular batteries and a 6.5 kVA hybrid inverter.
MESL scope
The supplied photographs show the rooftop array and an MESL engineer at the installation. The reported equipment mix brings PV generation together with hybrid conversion and battery storage.
Documented outcome and limits
The source confirms the system rating, module count, battery type and site. It does not give generation monitoring, runtime, savings or a project completion date.

