Project overview
The project record identifies a Karu site requiring an integrated solar and storage installation. It lists a 12 kVA hybrid inverter, a 20 kWh Aurora battery bank and ten 620 W solar modules.
MESL scope
The portfolio photographs show rooftop modules and the indoor inverter and battery equipment. The listed components were brought together as a hybrid system for solar generation and stored-energy use.
Documented outcome and limits
The supplied record confirms the installation and commissioning scope, location and component quantities. It does not publish measured energy yield, backup runtime, savings or commissioning date.

